Cheyenne Permanent Makeup Power Supply Machine Kit

May 28, 2020

Leave a message

The Cheyenne Permanent Makeup Power Supply Machine Kit PU2 has two output jacks for running two machines at one time. The PU2 has a built in jump-start Starter Cable Chip. Special Starter Cable not required.


The Permanent Makeup Power Supply Machine works with all tattoo pen machine or permanent makeup machine pen, cosmetic pen machine. The machine is digital with fast and simple adjustment levels. The power supply is small and lightweight and easy to carry and clean.

You won't have any problems to start and run your Nouveau Contour Permanent Makeup Machine Pen with the Cheyenne Power Supply PU2 . The new integrated board makes it possible to start the machine with 0-12V. You can use this power supply kit to run any standard coil or rotary tattoo machine on the market.

 

Rose Permanent Makeup Machine Pen

The Rose Permanent Makeup Machine Pen uses cartridge needles, Clean and safe, The needles output size max to 3-4MM
It provides enhanced power and precision for optimum pigment penetration and long lasting results
Swiss motor make the machine works powerful and smooth, almost no noise.

Specification

 

Material:Aluminum

AC dapcter:US,UK,Au,Eu available

Input voltage: 110-240V

Output voltage: 0-12V

Electricity: 0-3.5A

Speed:8000-12000r/min

Medium stroke 0-3.5mm

Weight: about 160g

 

 

Our Service:

* OEM service and support
* Available Sample Development
* Export Processing Support
* Clients Service One-to-One
* Effective Communication within 24 hours
* Showroom ready to be visited at any time
* Attend exhibition to meet customer face to face
* New design and style collection updating for customer


FAQ

 

Questions And Answers

 

1. Are you a trade company or a manufacturer?

A: We are an FCA, CE, FDA approved manufacturer from China .OEM & ODM service are available.

 

2. What about your freight charge?

A: The freight cost will charge according to the weight or size of the detailed order.

 

3. What is your delivery time?

A: The delivery date is about 5-7 days, mass production time needs about 1-2 weeks.

 

4. What about the shipping method?

By DHL, Fedex, TNT, UPS, EMS ect, which only takes 7-15 days.

 

5. What is your payment terms?

A: We accept Paypal, Western Union, Bank transfer.

 

6.How to deal with the faulty?

A: Our products are produced under strict quality control system, and the detective rate will be less than 0.2%. During the guarantee period, we can recall back the detective products and repair the products and resend to you or we could agree for a solution after discussion.

cheyenne power supply machine

Send Inquiry
Send Inquiry